7.5" Gauge
 

2022-01-08 DAVID LOADING BUCKET WITH BASKET.JPG

Al & David N. ballasting and levelling the SW Loop

David N. loading ballast into buckets for SW Loop

2022-01-08 PANTRY FOR NEFLS KITCHEN.JPG

New pantry for the camp kitchen

Perry Taylor inspecting track on his speeder.

New Sign Welcoming folks to the railroad

Al, Charles and Rich laying the station by-pass track!

Positioning the Bell Barn in its new home.

Moving the Bell Barn.

2022-04-09 THE SWAMP ROUTE.JPG

Work begins on the approach to the new Swamp Route.

2022-04-09 MIKE LEVELING THE ROADBED.JPG

Mike clears new entrance to the yard from the Beeline Route

2022-04-09 BEE LINE TUNNEL CLEAN OUT_1.JPG

Work on the Tunnel Cut on the Beeline Route.

20220409_093942.jpg

Second track completed by Cipriani Station!

2022-04-10 BEE LINE AT JCT.JPG

Track crew begins fine grading and track lying on the East end of the Beeline Route.