December 2019 7.5" Progress
![](https://static.wixstatic.com/media/b79c4e_2e9e8b70258a4a29a67c8f1dc051d4a2~mv2.jpg/v1/fill/w_456,h_302,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b79c4e_2e9e8b70258a4a29a67c8f1dc051d4a2~mv2.jpg)
![](https://static.wixstatic.com/media/b79c4e_0e7f1a61c0d94289922dc5c0516c8f38~mv2.jpg/v1/fill/w_457,h_302,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b79c4e_0e7f1a61c0d94289922dc5c0516c8f38~mv2.jpg)
Laying the track over graded and leveled roadbed. A layer of used carpet prevents the crushed granite ballast from disappearing into the soft sugar sand. A two inch layer of ballast is evenly spread over the carpet. A twenty foot long track panel is lifted into place and joined with the preceding panel. It's just simple, back-breaking work! Come on out and join us.
![](https://static.wixstatic.com/media/b79c4e_7e199eb8656d4684b9bd834d44a3b8e4~mv2.jpg/v1/fill/w_456,h_301,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b79c4e_7e199eb8656d4684b9bd834d44a3b8e4~mv2.jpg)
![](https://static.wixstatic.com/media/b79c4e_0ff0488f3c254440a3ffa4b2490488ab~mv2.jpg/v1/fill/w_458,h_301,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b79c4e_0ff0488f3c254440a3ffa4b2490488ab~mv2.jpg)
![](https://static.wixstatic.com/media/b79c4e_57f6756f89b64e80a3257bd4bbee259e~mv2.jpg/v1/fill/w_600,h_398,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/b79c4e_57f6756f89b64e80a3257bd4bbee259e~mv2.jpg)